Residential architecture.
Your questions, answered.
A place to begin. Explore the decisions, people, and approvals involved in creating a home, from the first idea to construction.
Starting your project
The first decisions are about the property, your priorities, and what needs investigation before design begins.
What kinds of homes does VRchitects design?
VRchitects designs modern custom homes, residential additions, and renovations across California, with a body of work in the Bay Area. Each project begins with its own site and household rather than a fixed house style. The project gallery offers a sense of the spaces, materials, and scales we have explored.
Explore our projects ↗Should I talk with an architect before buying a lot or home?
An early feasibility conversation can reveal questions to investigate before you commit: what the parcel may accommodate, whether an existing structure suits your goals, and which surveys or specialist opinions may be needed. It can inform a purchase decision, but it is not an approval from the city or a replacement for legal, financial, and property due diligence.
See how a project begins ↗What should I bring to the first meeting?
Bring the property address, a description of how you want to live, your main priorities, a working construction budget, and any important timing needs. Existing plans, a survey, photographs, or images you respond to are helpful if available. You do not need a finished design; the conversation should help identify what to study next.
Tell us about your project ↗How do I decide between renovating, adding on, and rebuilding?
Begin with the condition and layout of the existing home, the site’s constraints, and what your household needs to change. Structural conditions, energy goals, usable outdoor space, cost, and the likely review path can shift the balance. A feasibility study can compare options before you invest in a detailed design for one direction.
Read the process guide ↗Design and collaboration
Design develops through a sequence of choices, reviews, and increasingly detailed drawings.
What happens during schematic design?
Schematic design tests the broad direction: how the home sits on the site, how rooms relate, and how light, circulation, privacy, and outdoor space work together. Plans and three-dimensional views can help compare options. It is the right time to challenge the overall approach while substantial changes are easier to make.
Explore the design stages ↗What changes during design development?
After the overall direction is chosen, the design gains definition. Window placement, materials, kitchens and baths, and the relationship between architecture and building systems receive closer attention. Consultants may contribute structural or other specialist work as needed. Your decisions at this stage affect the experience of the home and what a builder will eventually price.
How does BIM help me review a home design?
BIM and three-dimensional views can make scale, movement, and relationships between spaces easier to understand before construction. They give you a shared reference for discussing options and asking better questions. The model’s level of detail grows through design; it cannot reveal every concealed site condition, guarantee a permit, or establish a final construction price.
What decisions will you need from me?
Your input shapes the brief, the preferred design direction, key materials, and choices that affect scope and cost. The team should make clear which decisions are needed before moving to the next phase and what information will support them. Timely, recorded approvals help keep drawings and consultant work aligned when several people are making choices.
Planning and permits
The review path depends on the specific property, proposal, and local jurisdiction.
How can I find out what I may build on my property?
Start with the parcel’s zoning and available property records, then test your idea against setbacks, height, floor area, easements, trees, and other relevant site conditions. A survey or specialist study may be necessary to answer particular questions. Lot size alone will not establish what can be approved; the local jurisdiction reviews the actual proposal.
Read the planning guide ↗What is the difference between planning approval and a building permit?
Planning review generally considers the proposed use, placement, size, and design against local land-use rules. Building review considers the construction documents against applicable building and safety requirements. Some projects need both, while the route varies with the jurisdiction and work proposed. Planning approval by itself does not authorize construction.
Understand the review stages ↗Are schematic plans the same as permit or construction drawings?
No. Schematic plans communicate a proposed layout and design direction. A permit submission needs the information required for agency review, and construction documents develop the coordinated detail a builder needs to price and construct the work. The content and timing of each set depend on the project and the agreed services; the labels alone do not define a deliverable.
Who responds when a city requests plan corrections?
The agreement should identify who submits applications, coordinates consultants, and responds to review comments. The architect may address comments on architectural drawings while engineers or other consultants address their disciplines. Revisions should remain coordinated across the set. The reviewing agency decides whether the response satisfies its requirements, so a correction round is not an automatic approval.
Read about corrections ↗What affects the design and permit schedule?
Scope, site conditions, survey and consultant work, owner decisions, the applicable approval path, and agency review comments all affect timing. A renovation and a new home may follow different sequences. Ask for a project-specific schedule with decision and revision time built in, then update it as information arrives. An estimated date is not a permit guarantee.
Fees and budget
A useful budget separates design services, construction, and other project costs.
What do architectural fees cover?
Architectural fees pay for the services and deliverables described in your agreement. Depending on the scope, those may include design phases, documents, review coordination, or construction-phase services. Ask how the fee is calculated, when payments are due, what is excluded, and how additional work is authorized. The written scope matters more than a general description of a full-service process.
Understand the project scope ↗Are architect and engineering fees part of the construction cost?
Design and consultant fees are separate from what the builder charges to construct the home, unless a particular proposal explicitly groups them. An overall budget may also need surveys, investigations, agency fees, utility work, landscape or interior work, and an allowance for changes. Ask who contracts with and pays each specialist so proposals can be compared on the same basis.
When can I get a reliable construction price?
Early pricing can test whether a design direction fits your resources, but it rests on assumptions that should be stated. A builder’s later bid or negotiated proposal based on developed documents offers a more defined scope, yet changes and unknown conditions can still affect cost. Revisit priorities as the drawings mature and ask what each price includes or excludes.
What tends to move a home project over budget?
Site access, structural discoveries, material and system choices, changes in size or scope, market pricing, and decisions made after documents are developed can all change cost. The most useful response is an early budget checkpoint and a clear record of tradeoffs. Ask what a proposed change will do to both price and schedule before approving it.
From drawings to construction
Builder involvement and the architect’s role during construction should be decided before work begins.
When should a builder join the conversation?
A builder can offer construction and pricing input while the design is still flexible, or builders can bid after the documents and scope are more developed. Each approach gives you a different kind of cost information. Discuss the timing early so feedback can inform decisions, and compare the assumptions and exclusions behind any proposed price.
Plan builder involvement ↗How are an architect, engineer, and builder’s roles different?
The architect develops and documents the design within the agreed scope. Engineers and other consultants address their specialist disciplines. The builder prices and constructs the work, typically under a separate construction agreement with the owner. Coordination connects these roles, but it does not make one party responsible for another’s contract or day-to-day construction methods.
Will the architect help compare builder proposals?
That depends on the signed scope. If included, the architect may help clarify drawing questions, compare what proposals include, and identify design-related differences. You should also review schedule, allowances, exclusions, references, and how each builder handles changes. A low initial number may reflect a different interpretation of the work rather than a lower final cost.
What does the architect do while the home is being built?
When construction-phase services are included, the architect may answer design questions, review relevant submittals, and visit at agreed intervals to observe general progress and discuss design intent. The agreement should define frequency, authority, and how changes are handled. The builder remains responsible for construction methods, site supervision, and day-to-day scheduling under its contract.
What happens if we change our minds during construction?
First describe the proposed change clearly and ask the builder and design team to assess its effects on drawings, approvals, price, and schedule. Some changes may require consultant revisions or agency review. Record the decision and authorization before work proceeds so everyone uses the same direction. Earlier decisions are usually easier to absorb than changes after materials are ordered or installed.